Photo of an attempted break into the Smartcycle soffit installed into a concrete ceiling.

Live break-in demo

Live break-in demo

SmartCycle holds the line

Security

Urban infrastructure

Los Angeles

District 7

The challenge

Caltrans District 7 leadership requested a live demo to verify product resilience under field-level attack conditions before scaling further.

Caltrans District 7 leadership requested a live demo to verify product resilience under field-level attack conditions before scaling further.

Photo of an attempted break into the Smartcycle soffit installed into a concrete ceiling.

The simulation

A new SmartCycle soffit was subjected to controlled break-in attempts using hammers, pry bars, and blunt instruments—mimicking real-world tampering scenarios.

A new SmartCycle soffit was subjected to controlled break-in attempts using hammers, pry bars, and blunt instruments—mimicking real-world tampering scenarios.

The outcome

No breach occurred during the demo.

Minor cosmetic damage only; structural integrity maintained.

Cover was easily removed post-test with approved SmartCycle tools.

Observed by 10+ Caltrans leaders; reinforced confidence in procurement pipeline.

Photo of an attempted break into the Smartcycle soffit installed into a concrete ceiling taken from below.
Close up of the Smartcycle soffit.

Protect your city today.

Upgrade to next-gen infrastructure safety.

© 2026 SmartCycle Solutions Inc.

Created by

Close up of the Smartcycle soffit.

Protect your city today.

Upgrade to next-gen infrastructure safety.

Close up of the Smartcycle soffit.

Protect your city today.

Upgrade to next-gen infrastructure safety.

© 2026 SmartCycle Solutions Inc.

Created by